1.1 PROBLEMS AND ITS SETTING
The supervisor of exams in most cases has negative effect on both the students and the lecturers. the students sometimes feels reluctant in leering for exams hall early because when they might have spent times, ignore some useful chores at home, some even goes as far as leaving food just to make sure they are at the exam hall on time, only for them to find out that hours after they come as the exact time scheduled for the exam, the supervisor has not yet come. This also can cause poor result on the side of the students because after the time wasted, much waiting for the supervisor energy wasted, weakness due to rushing, the student finds out the he/she can no longer concentrate to write, most of the things read might be lost at that time.
The introduction of computer in examination supervision scheduling will be a breakthrough to the pitfalls mentioned above.
1.2 STATEMENT OF THE PROBLEM
The task of examination supervision in Institute of Management and Technology (IMT) Enugu is manually executed at present and supervision scheduling is prepared and pasted at the notice board same way. Some of the problems encountered in the manual system includes: –
In this work, the above –mentioned problems are solved in the following order
1.3 PURPOSE OF STUDY
The study of the existing system is aimed at automating the manually operated procedures of examination scheduling in terms of supervision. This helps to eliminate much worked on the examination supervision scheduling officials and time fine preparation. It is also aimed at making the process of computation very easy and to produce a stable and reliable report for the management.
This computerized system of operation will in turn reduce much cost on examination procedures thereby, being cost effective.
1.4 AIMS AND OBJECTIVES
The study is significant in the sense that the researcher is aimed at achieving the following: –
1.5 THE DELIMITATION
The researcher is based on finding the easiest way of scheduling examination supervision in IMT Enugu.
This research involves programs that are written in Q BASIC programming Language to aid computerize the examination supervision scheduling.
1.6 THE LIMITATION
There are uncontrollable factors that acted as constraints to the efforts of the researcher. Those factors includes the following: –
Time: –
The research task is a big one and requires time and energy. It is done during the final semester which is a critical time for the students whereby the student will be preparing seriously for his/her final exams and at the same time carrying out research work on the case study for the project.
Finance: –
Financial constraint is the most limiting factor. Due to financial problems, I was not able to afford all the needed materials.
1.7 THE ASSUMPTION
It is assumed that all the programs inputted to the computer system for computing the examination procedures are perfectly in order. It is assumed that computerization of examination supervision scheduling software system will promote accuracy and efficiency of examination supervision. Computerization of examination procedures is the easiest way of printing exams and records. It is assumed that examination supervision scheduling script produced with computer contains less error.
1.8 THE DEFINITION OF TERMS